KS Engineers, P.C. (KSE) performed the design of three new park and ride facilities (Snowden, Delanco, Hamilton). For this project KSE was responsible for the preparation of contract documents for grading and drainage, pavement striping and traffic signing, and soil erosion and sediment control. Specifically the scope of work included the following:
- Grading and drainage
- Detention and catch basins
- On-site geometrics
- Signage and striping
- Pavement design
- Roadway,sidewalk and curb construction or reconstruction.